




$69,870
For Sale/Financing: High-End Studio Apartment. Pichincha 3rd Floor, Unit 2 Rear-facing OVERVIEW The building consists of a ground floor and 9 stories. It is a type of building that emphasizes thermal and acoustic comfort; to achieve this, we use materials such as Retak, DVH windows, double walls, electric blinds, and balcony awnings as appropriate. It features two parking levels: one in the basement and another on the ground floor. On the first floor, the office is located at the front; it has two entrances—one directly from Alvear Street and the other from the first-floor landing. On the rear side are the amenities, including a gym, a barbecue area, and open and semi-open patio areas. - From the 2nd to the 4th floors, there are 2-bedroom units facing the street and 1-bedroom and studio units on the opposite side of the building. - The 5th floor features 2-bedroom units. - Unit 6A: A 3-bedroom duplex with a private terrace. This apartment spans the 6th and 7th floors. - Unit 6B: A 2-bedroom unit with a private terrace, also located on the 7th floor. - Unit 8A: 2 bedrooms; the kitchen, living room, and dining room are on this floor; the bedrooms are on the 9th floor; and the 10th floor features a private terrace with direct access from the apartment. DELIVERY DATE October 2026. FINISHES - Aluar Modena Line aluminum exterior windows and doors. - Radiator heating system - Motorized roller blinds. - Security doors with 5-point locking system - High-traffic porcelain tile flooring in the living room, kitchen, and dining room - Laminate flooring in the bedrooms - Built-in closets with sliding doors in bedrooms - Granite countertops - Kitchen cabinets with upper and lower cabinets - Longvie stainless steel oven and stove - Ferrum fixtures in the bathroom and FV faucets - Pre-wiring for air conditioning - Interior walls finished with plaster - Wood baseboards GARAGE: Optional USD 22,290 PAYMENT OPTIONS Cash or Financing: A 30% down payment of the total value of the unit is paid into the escrow account, and the remainder is divided into monthly installments paid over the 36-month construction period, which are subject to increases by the Chamber of Construction.
Indoor & Comfort
Outdoor & Recreation
Security
Building Services
Lifestyle
Explore hospitals, schools, coworking spaces, and travel times in the neighborhood.
